FAQs

What happens to the remaining CO2?

The CO2 is ready for sequestration,commercialization. Further details are available upon request.

How much water is consumed in the Powerdyne System?

The water is completely returned in a closed loop system.

What happens to the ash?

The Powerdyne system does not produce ash.

How long will the power plant be out of service?

The power plant is not taken out of commission as the  Powerdyne System can be installed concurrently while the existing plant is still producing power and can be valved into the existing steam line when final testing is completed. The old boiler equipment can then be removed.

Approximately how much space is needed?

This will vary based on size of plant. Additional details are available upon request.

Where is the black box?

The black box is our gasification system.

Can you give me a ball park estimate?

The estimate is approximately 70% of the average price to build the same Power Plant in the same location.

How much does it cost to build a 100MW Power Plant?

The cost varies from country to country as most of the components can be built locally under license.

How long does it take to build a 100MW Power Plant?

Depending on the location and permit requirements, it takes between 18 months to 24 months after the permit is approved.